[WORKING DETAIL 22.04.10] Facade construction

At the earliest stages of concept design, the facade system was developed in detail around the particular material properties of Cor-ten steel. As long as it is detailed and installed correctly, weathering steel will last a very long time. One of the keys to developing a robust Cor-ten facade is to ensure that the system is well-drained. Gaps between components must be at least 5mm wide to ensure water cannot get trapped and cause corrosion.

We originally proposed an insulated cold-formed framing system to support the inner leaf of the facade as part of a ventilated rainscreen.  However, during the package tender stage, the subcontractor proposed an alternative solution. This consisted of Cor-ten cassettes on a modified version of a standard rainscreen carrier system fixed to SIPs (structurally insulated panels). This approach offered significant programme advantages to the contractor because the building could quickly be made watertight, thus allowing interior construction to proceed well before installing the Cor-ten. The component supplier was also able to offer the reassurance of a comprehensive ‘through-wall’ warranty for the full assembly.

The rails of the rainscreen cladding system are continuously supported on the SIPs, which are bolted to the floor slabs. The Cor-ten has a relatively high mass due to the thickness of the metal. The infill glazing consists of a ‘window-wall’ system – a type of hybrid window/curtain walling system spanning from floor to floor.

The cladding panels, which are made from 3mm-thick Cor-ten cassettes in various module widths, have acquired their patina at differing rates, dependent on their location and exposure. After approximately six months, all the panels have weathered to a uniform rich red/brown colour.
Simon Carter, architect, Feilden Clegg Bradley Studios

  • Comment

Related files

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions.

Links may be included in your comments but HTML is not permitted.

Related Jobs

AJ Jobs