DETAIL CROSS-SECTION THROUGH TRUSS

  • Comment

DETAIL SECTION THROUGH TRUSS AT PERIMETER

CONNECTION

KEY CROSS-SECTION

ISOMETRIC OF TRUSS CONSTRUCTION

193mm dia CHS

spine beam

89mm dia CHS outrigger

welded to spine

89mm dia CHS outrigger

welded to spine

125mm

193mm dia CHS 'stiletto'

tapered to 60mm dia

roof glazing system of

double-glazed units

8mm toughened glass upper panel,

12.8mm laminated glass lower panel,

in painted steel frame

CHS stub to

support glazing

insulated ridge cap

outrigger welded to

carbon steel casting

89mm dia CHS bottom boom

pinned to forked connector

of carbon steel casting

gutter rib double-bolted

to carbon steel casting

latchway fitted

to edge of gutter

preformed ms

gutter lining

50mm rigid insulation

and vapour barrier

structural gutter of

ex 15mm ms plate

75mm deep gutter rib

of ex 35mm ms plate

ss casting with

cast spigot welded

to stiletto

89mm dia CHS outrigger

pinned to forked connector

89mm dia CHS outrigger

pinned to forked connector

tensioned 40mm ss rod

with spade connector

to ss casting

DETAIL SECTION THROUGH TRUSS AT PERIMETER CONNECTION

193mm dia CHS perimeter truss

member with cruciform flange

welded for spine beam connection

193mm dia CHS spine beam

slotted over cruciform flange

1.6mm ms flange

cover plate

40mm ss rod pinned to

welded flange with

forked connector

89mm dia CHS outrigger

welded to spine

89mm dia CHS outrigger

welded to spine

125mm

roof glazing system of

double-glazed units

8mm toughened glass upper panel,

12.8mm laminated glass lower panel,

in painted steel frame

CHS stub to

support glazing

insulated ridge cap

outrigger welded to

carbon steel casting

gutter rib double-bolted

to carbon steel casting

latchway fitted

to edge of gutter

preformed ms

gutter lining

50mm rigid insulation

and vapour barrier

structural gutter of

ex 15mm ms plate

75mm deep gutter rib

of ex 35mm ms plate

193mm dia CHS

top boom

40mm ss rod pinned to

welded flange with

forked connector

KEY CROSS-SECTION

lower concourse

concourse

shop

glazed roof

louvre screen

2.5m lowest position

of bottom boom

1.3m

ISOMETRIC OF TRUSS CONSTRUCTION

193mm dia CHS perimeter truss

member with cruciform flange

welded for spine beam connection

193mm dia CHS spine beam

slotted over cruciform flange

1.6mm ms flange

cover plate

40mm ss rod pinned to

welded flange with

forked connector

193mm dia CHS

spine beam

89mm dia CHS outrigger

welded to spine

89mm dia CHS outrigger

welded to spine

125mm

193mm dia CHS 'stiletto'

tapered to 60mm dia

roof glazing system of

double-glazed units

xmm toughened glass upper panel,

xmm laminated glass lower panel,

in painted steel frame

CHS stub to

support glazing

insulated ridge cap

outrigger welded to

carbon steel casting

89mm dia CHS outrigger

welded to spine

89mm dia CHS outrigger

welded to spine

89mm dia CHS outrigger

pinned to forked connector

of carbon steel casting

gutter rib double-bolted

to carbon steel casting

latchway fitted

to edge of gutter

preformed ms

gutter lining

50mm rigid insulation

and vapour barrier

structural gutter of

ex 15mm ms plate

75mm deep gutter rib

of ex 35mm ms plate

193mm dia CHs top boom

of perimeter truss

  • Comment

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions.

Links may be included in your comments but HTML is not permitted.

Related Jobs

AJ Jobs