ODA says 2012 Olympics will not be exclusively Design and Build
- Published: 23 November 2006 11:22
- Author:RV | More by this Author
- Last Updated: 01 January 2007 00:00
In an embarrassing U-turn, the Olympic Delivery Authority (ODA) has now confirmed that not all the London 2012 Olympic projects will be Design and Build contracts.
Sign in
In order to continue you need to be a registered user. If you would like to register to The Architects' Journal then click here.
