Leeds Bradford airport Terminal building extension

  • Published: 14 February 2008 17:33
  • Last Updated: 14 February 2008 17:33
  • Reader Responses  

Design, project management and health and safety services for the extension, refurbishment and redevelopment of the airport terminal building. The airport wishes to appoint a single organisation to undertake architectural design; civil/structural engineering design; building engineering services design; quantity surveying; CDM coordinator services and project management services for the design of an extension to the terminal building and the refurbishment and reconfiguration of the existing terminal. It is anticipated that other specialist consultants including, but not limited to, planning, highways and traffic, environmental and ecological consultants will be appointed separately. Those organisations who wish to be considered should submit an expression of interest requesting a copy of the pre-qualification questionnaire and including the required fee.

Contact: Mark Redgard, UK-Leeds LS19 7TU. Tel.  011 33 91 32 22. E-mail: mark.redgard@lbia.co.uk. Fax  011 32 50 54 26.

Estimated construction cost is ₤19 000 000.


EU Code: 2008/S 28-037952

Time limit for receipt of requests for documents or for accessing documents: 6.3.2008.


Please note: In order to post a response you need to be registered on the site. You can register here.