Planning application submitted November 2000 Planning consent May 2002 Start on site date February 2004 Tender date Tender process completed January 2002 Proposed completion 31st July 2006 Gross internal floor area Circa 104,000m 2 Form of contract Design and build (2 stage tender). A bespoke design and build with guaranteed maximum price (with L&A damages of £250,000 per week or part thereof) Total cost Total project cost £357 million. This includes the cost of the land, planning, stadium design and construction costs. It also incorporates the relocation of local businesses and statutory services including the construction of a state-of-the-art £60 million waste-recycling centre and depot for Islington, the upgrading of transport infrastructure and significant regeneration of the surrounding area.

Architect HOK Sport: Christopher Lee, Sean Jones, Caroline Mills Development consultant Anthony Green & Spencer Planning consultant Hepher Dixon: Roger Hepher Project manager AYH: Sean Andrews Health & safety consultant AYH: Keith Bushell Transport consultant Steer Davies Gleave: Allan Gooch, Roy McGowan Structural consultant Buro Happold: Geoff Werran Acoustic consultant RPS Planning Transport & Environment: Darren Humpheson Steelwork contractor Severfield-Reeve: Jon Severs Blockwork contractor Frank Staddon, Terry Murphy ARSENAL EMIRATES STADIUM, LONDON Carpentry/joinery Hammal Joinery Concreting contractor Byrne Brothers: Bob Elliott, Caroline Hall Roofi ng contractor Sir Robert McAlpine & Sons Fire prevention contractor Wormald Britannia Fire Systems: John Hawley Lifts/escalators contractor UK Lift: Steve Wayman Mechanical contractor MJN Colston: Ian Smith Mechanical & electrical contractor Piggott & Whitfield: Lawrence Archibald Main contractor Sir Robert McAlpine & Sons: Rolv Kristiansen, Des Senlon Land agents Anthony Green & Spencer: Anthony Spencer Environmental engineers CPM: Julian Arthur Subcontractors and suppliers Soffi t insulation Advantage Engineering; general labour/banksmen Avondale Construction; in-situ concrete works Byrne Brothers;

louvres Colt International; railway possession operatives Coyles;

temporary electrics/plumbers Crosby Electrical Services; ventilation E & S Heating & Ventilation; ground contamination investigation Enviros; roof lighting, back of bowl cladding Facade Engineering Systems; terrace Mastic Sealant Fastglobe (Mastics); safety scaffold GBG Construction; general electrical installation Goodmarriot & Hursthouse; site security H & M Security Services; sprinklers Hall & Kay Fire Engineering; fire alarms PA & Voice Alarm System, CCTV, BMS Honeywell Control Systems; brickwork & blockwork Irvine Whitlock; OLE alterations, isolations, signal & cable service diversion Jarvis Facilities;

demolition/excavation Keltbray; concrete cutting Kilnbridge Construction; lifts/escalators Kone; mechanical services installation MJN Colston; inclined curtain walling MJN Colston; roofing (main roof) Prater Roofing; roofing - levels 4 & 5 Rock Asphalte;

piling Stent Foundations; precast concrete terrace units Tarmac Precast Concrete; structural steelwork Watson Steel; facade glazing Parry Bowen; electrical installation Goodmarriott & Hursthouse