By continuing to use the site you agree to our Privacy & Cookies policy

Retrofit case study: Wolfe Crescent

Sustainability in Practice: Wolfe Crescent in Charlton by Levitt Bernstein

Project data

House type 1920s semi-detached
Location Charlton, south-east London
Project team leader London Borough of Greenwich
Energy consultant The Healthy Home
Construction type Rendered solid brickwork
U-values External wall, 0.1 W/m2K; roof insulation at joist level, 0.13 W/m2K; triple-glazed timber windows and doors to north and east, 0.75 W/m2K
Services upgrading Combined air-source heat pump and MVHR; solar hot-water panels; electric radiator in bathroom operated by movement sensor
CO2 emissions before retrofit 124kg/m2/year
Estimated CO2 emissions after retrofit 10kg/m2/year, including 10kg saved by renewable energy
Percentage reduction 92 per cent

Have your say

You must sign in to make a comment.

Related Jobs

Sign in to see the latest jobs relevant to you!

The searchable digital buildings archive with drawings from more than 1,500 projects

AJ newsletters